Vestas Blades Research Facility - A Fixfast Case Study

Vestas Blades Research Facility

Newport, Isle of Wight
HomeCase StudiesVestas Blades
Project Details
Architect: Aukett Fitzroy Robinson
Location: Newport, Isle of Wight
Main contractor: Sir Robert McAlpine
Sub contractor: Prater Ltd
The DrillFast Stainless composite panel fasteners are the ultimate in reliability, even in the exceptional length required for this project.

Drilling heavy steel without fuss, supporting the outer skin impeccably, with the proven longevity of A2/304 stainless steel.

Our maximum reliability, minimum fuss promise extended to more than just the product – the contractor on this project had the certainty that deliveries would be on site when needed – every time.

“I always ask the buyers for your fixings – you just don't get any problems with them.”
Barry Coldren Project Manager | Prater Ltd