Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
2 Weeks
Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
2 Weeks
Estimated lead times
2 Weeks
Estimated lead times
2 Weeks
Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
2 Weeks
Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
2 Weeks
Estimated lead times
2 Weeks
Estimated lead times
2 Weeks
Estimated lead times
1 Day
CHARACTERISTICS AND BENEFITS
- Easy installation
- Use in cracked and non-cracked concrete
- Use for medium-heavy duty loads
- Variety of lengths and diameters
- Suitable when reduced distance to edge and between anchors is required
- Working by mechanical interlock between concrete and thread
- For static and quasi static loads and seismic
- Direct fixing; no wrench needed
- Can be uninstalled leaving the surface clear
- Embossed flange to increase friction on the fixture
APPLICATIONS
- Structural fixings
- Glazing, windows and shop windows
- Industrial racks
- Installation of railings and handrails in interiors
- Fixation of steel structures, canals, machinery, boilers, signs, stadium seats, facade substructures, etc
- Fixing of wood structures in concrete
BASE MATERIAL
- Concrete class C20/25 to C50/60 cracked or non-cracked
CHARACTERISTICS AND BENEFITS
- Easy installation
- Use in cracked and non-cracked concrete
- Use for medium-heavy duty loads
- Variety of lengths and diameters
- Suitable when reduced distance to edge and between anchors is required
- Working by mechanical interlock between concrete and thread
- For static and quasi static loads and seismic
- Direct fixing; no wrench needed
- Can be uninstalled leaving the surface clear
- Embossed flange to increase friction on the fixture
APPLICATIONS
- Structural fixings
- Glazing, windows and shop windows
- Industrial racks
- Installation of railings and handrails in interiors
- Fixation of steel structures, canals, machinery, boilers, signs, stadium seats, facade substructures, etc
- Fixing of wood structures in concrete
BASE MATERIAL
- Concrete class C20/25 to C50/60 cracked or non-cracked