Merstham Park School
Redhill
With the construction of a brand new, state-of-the-art low carbon secondary school, the educational facility underlines their motto of 'igniting a passion for learning' - seen in the high quality classrooms providing an education and leisure space (including a dance studio and all weather sports pitch) for 900 students.
Challenge
178 modules were craned into location within a 6 week period - meaning less time on-site, less hassle, and faster install; avoiding extra disruption and delays to site works.
Award winning roofing and cladding contractor Marksman Roofing + Cladding was contracted for the cladding of the building - including the sports hall, (the only building constructed on-site), to fix the stunning Rockpanel Chameleon exterior that blends in with the surrounding environment - futureproofing the look of the school for years to come.
Solution
For this project we were able to assist Marksman with our lacquered DrillFast fasteners - with low profile heads to blend in with the cladding, these fasteners are available for light or heavy steel.
Alongside our DrillFast lacquered fasteners, we also provided our SureFast 6.1mm diameter concrete screws, and a range of other fixings including wood screws and wing drillers such as our DF12-W fasteners.