Leeds Arena - A Fixfast Case Study

Leeds Arena

Leeds, Yorkshire
HomeCase StudiesLeeds Arena
Project Details
compass Architect: Populous
location Location: Leeds, Yorkshire
crane Main contractor: BAM Construction Ltd
subcontractor Sub contractor: Lakesmere Ltd
The striking First Direct arena boasts a unique 'honeycombed' external facade that has been based on a mathematical diagram to create a pattern of varying cellular shapes - further complemented by glass panels and the use of coloured lights.

Creating such an unusual facade was no easy feat - Lakesmere worked very closely with main contractor BAM Construction to devise a specification that would satisfy the vision of the extensive design team (headed up by architects Populous), while also providing a practical and economical solution.

The Lakesmere team therefore suggested the use of a built-up cladding system featuring aluminium shingles and perforated rainscreen cladding, which come to life through the use of kaleidoscopic lighting.

DrillFast lacquered fasteners played an essential role in this project – providing a functional yet stylish fastening connection.

“By far, Fixfast are the best company to deal with for fixings”
Richard Wingate International Director
Share this article share